Advance Mills Bridge May Come Down

By: Hailey Frances Email
By: Hailey Frances Email

June 6, 2007

Just last week barricades went up on both sides of the old advance mills bridge. Overweight cars were causing too much stress on the steel beams.

Now VDOT officials are looking for a way to get vehicles safely from one side to the other. They say the quickest option to get traffic flowing is to remove the old bridge and build a temporary one in it's place.

"It certainly is a good option to get traffic over the river in the short term. It will be a one lane structure that's as wide as it can be given the existing substructure the piers and the butlers we'll be using- but it is a way to get traffic across the bridge in the short term" said VDOT Spokesperson Lou Hatter.


The comments sections of Newsplex.com are designed for thoughtful, intelligent conversation and debate. We want to hear from our viewers, but we ask that you follow our rules for commenting. E-mail is required to comment on a story, but it will not be displayed with your comment. For complete rules, CLICK HERE. The Newsplex reserves the right to not post or to remove any comment.
powered by Disqus
The Charlottesville Newsplex 999 2nd Street S.E. Charlottesville, VA 22902 434.242.1919 – Main 434.220.7522 - Newsroom
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 7871627 - newsplex.com/a?a=7871627