Proffit Rd. Bridge Scheduled for Clean Up


March 12, 2013

After being postponed once before, the Proffit Road bridge clean up is scheduled for next week.

The road around the bridge will be closed March 19 and 20.

The Virginia Department of Transportation (V-DOT) is bringing in a crane to clean up debris around the bridge that is getting in the way of the water's flow.

In the past, trees and debris have caused water to run over the bridge during heavy rain storms.


The comments sections of Newsplex.com are designed for thoughtful, intelligent conversation and debate. We want to hear from our viewers, but we ask that you follow our rules for commenting. E-mail is required to comment on a story, but it will not be displayed with your comment. For complete rules, CLICK HERE. The Newsplex reserves the right to not post or to remove any comment.
powered by Disqus
The Charlottesville Newsplex 999 2nd Street S.E. Charlottesville, VA 22902 434.242.1919 – Main 434.220.7522 - Newsroom
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 197561861 - newsplex.com/a?a=197561861